3. Installing the CPX-1000
1000-A2-GN22-00
3-12
February 2003
Attach the
Mounting
Flanges
The CPX ships with a pair of reversible mounting flanges for either
a 19-inch or a 23-inch standard or seismic rack. One orientation of
the mounting flanges fits a 19-inch rack, and the reverse
orientation fits a 23-inch rack.
Step 1
Attach the flanges to the CPX chassis with the 10-32 pan head
screws with integral-toothed lock washer (provided).
Note
These flanges work in EIA310, Bell Narrow, and Bell
Wide racks. Installation in NEBS2000 racks requires
special mounting flanges, a separately orderable option.
Mounting Flanges in 23" Configuration
Use second set of flanges in
seismic racks with 3" deep
side rails.
Install second
set of flanges
after mounting
shelf in rack.
Install second set
of flanges after
mounting shelf in
rack.
Mounting Flanges in 19" Configuration
0486
1
2
3
4
5
6
7
9
11
12
13
14
ALARM
1
2
3
4
5
6
7
9
11
12
13
14
ALARM
Top View
Top View
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
ALERT A
ALERT B
ALERT C
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
DISABLED
UNLOCKED
ACT
DISABLED
UNLOCKED
ACT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
ALERT A
ALERT B
ALERT C
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
DISABLED
UNLOCKED
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
ACT
DISABLED
UNLOCKED
ACT
DISABLED
UNLOCKED
ACT
8
10
8
10
1
2
3
4
5
6
7
9
11
12
13
14
1
2
3
4
5
6
7
9
11
12
13
14
Summary of Contents for Jetstream CPX-1000
Page 14: ...Preface 1000 A2 GN22 00 x February 2003...
Page 24: ...1 Voice over Broadband Networking 1000 A2 GN22 00 1 10 February 2003...
Page 64: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 40 February 2003...
Page 100: ...3 Installing the CPX 1000 1000 A2 GN22 00 3 36 February 2003...
Page 128: ...5 Repair Procedures 1000 A2 GN22 00 5 14 February 2003...
Page 156: ...D Specifications 1000 A2 GN22 00 D 8 February 2003...