3. Installing the CPX-1000
1000-A2-GN22-00
3-4
February 2003
Turn-up
Checklist
Use this checklist when Provisioning and turning up the CPX. For
these steps, work from facilities and deployment information
provided by your network operating center to establish service
and manage of the CPX. Use the Jetstream software tools where
specified.
Task
Verify data fill settings and obtain provisioning settings from switch personnel
(as appropriate).
Check the bit error rate (BER) on every GR-303 PSTN line.
Using Console, perform a
stats
command on everything.
Refer to
Appendix A, Using the Console
.
Use JetCraft and JetStat to monitor the CPX and its associated IADs.
Refer to the
JetCraft User’s Guide
for more information.
Ensure that no cells are being dropped in the DSLAM or ATM switch.
Ensure voice is given priority on the DSLAM if QoS is available on the
DSLAM.
Record any discrepancies and corrective actions taken: (Briefly describe below)
Summary of Contents for Jetstream CPX-1000
Page 14: ...Preface 1000 A2 GN22 00 x February 2003...
Page 24: ...1 Voice over Broadband Networking 1000 A2 GN22 00 1 10 February 2003...
Page 64: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 40 February 2003...
Page 100: ...3 Installing the CPX 1000 1000 A2 GN22 00 3 36 February 2003...
Page 128: ...5 Repair Procedures 1000 A2 GN22 00 5 14 February 2003...
Page 156: ...D Specifications 1000 A2 GN22 00 D 8 February 2003...