February 2003
5-1
C
H
A
P
T
E
R
5
Repair Procedures
Use these procedures when removing or installing components:
Power supplies and fans (page
5-2
)
Alarm panel (page
5-4
)
Power distribution panel (page
5-5
)
Module removal (page
5-7
)
Hot swap (page
5-10
)
Hot growth (page
5-13
)
Recommended
Power Off
Power Off cuts input power to all power supplies. In dual-
configured systems, both domains lose input power. This
procedure is recommended when powering off the CPX:
Step 1
Shut down all software operations (JetVision, JetCraft).
Step 2
Flip the rocker switch in the rear of the shelf to the “0” position.
Emergency
Power-Off
In the event of an emergency, flip the rocker switch in the rear of
the chassis to the “0” position. This removes input power from the
power supplies and results in an abnormal system shutdown.
Voice/Data Interruption
Emergency power-off interrupts all traffic through the CPX.
Summary of Contents for Jetstream CPX-1000
Page 14: ...Preface 1000 A2 GN22 00 x February 2003...
Page 24: ...1 Voice over Broadband Networking 1000 A2 GN22 00 1 10 February 2003...
Page 64: ...2 CPX 1000 Voice Services Platform Description 1000 A2 GN22 00 2 40 February 2003...
Page 100: ...3 Installing the CPX 1000 1000 A2 GN22 00 3 36 February 2003...
Page 128: ...5 Repair Procedures 1000 A2 GN22 00 5 14 February 2003...
Page 156: ...D Specifications 1000 A2 GN22 00 D 8 February 2003...