5. Troubleshooting
9000-A2-GB33-20
May 2003
5-39
T3 User Port Physical Tests Screen Example (9520-ILM)
CAUTION:
You should not run these tests with frame relay equipment attached; you
must disconnect the frame relay equipment and use external test
equipment.
main/test/network 9520-ILM
Device Name: Node A 05/13/2000 08:06
T3 USER PORT PHYSICAL TESTS
Test Command Status Results
Local Loopbacks
Line Loopback: Start Inactive 0:00:00
--------------------------------------------------------------------------------
Ctrl-a to access these functions, ESC for previous menu MainMenu Exit