4. Configuration
4-16
March 2001
3150-A2-GB24-10
Procedure
To select the link layer protocol:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Mgmt selection appears on
the screen.
5. Select Mgmt.
6. From the Mgmt Config screen, select Gen.
7. Press F1 (Next) until the Com Link configuration option appears.
8. Press F2 (PPP) or F3 (SLIP).
F1
F2
F3
Edit:
User Alarm Mgmt
F1
F2
F3
Mgmt Config:
Gen Trap
F1
F2
F3
Com Link:
Next PPP SLIP
Summary of Contents for 3151
Page 1: ...ACCULINK CSU Models 3150 A4 and 3151 Operator s Guide Document No 3150 A2 GB24 10 March 2001 ...
Page 16: ...About This Guide x March 2001 3150 A2 GB24 10 ...
Page 28: ...2 Installation 2 8 March 2001 3150 A2 GB24 10 ...
Page 40: ...3 Using the Front Panel 3 12 March 2001 3150 A2 GB24 10 ...
Page 66: ...4 Configuration 4 26 March 2001 3150 A2 GB24 10 ...
Page 74: ...5 Security 5 8 March 2001 3150 A2 GB24 10 ...
Page 118: ...8 Testing 8 18 March 2001 3150 A2 GB24 10 ...
Page 120: ...A Front Panel Menu A 2 March 2001 3150 A2 GB24 10 ...
Page 152: ...C Configuration Options C 30 March 2001 3150 A2 GB24 10 ...
Page 168: ...E Pin Assignments E 10 March 2001 3150 A2 GB24 10 ...
Page 192: ...F SNMP MIB Objects F 24 March 2001 3150 A2 GB24 10 ...
Page 218: ...J Equipment List J 2 March 2001 3150 A2 GB24 10 ...