8. Testing
3150-A2-GB24-10
March 2001
8-3
Figure 8-3.
Test Jack Block Diagram
LINE
RECEIVER
INTERNAL
CIRCUITRY
LINE
RECEIVER
TERMINAL
EQUIPMENT
(DTE)
NETWORK
NET
Out
EQPT
In
MON
Out
NET
In
EQPT
Out
MON
In
496-14875
Mon Jack: EQPT
Mon Jack: NET
Mon Jack: EQPT
Mon Jack: NET
(Selectable)
(Selectable)
Table 8-1.
Test Jack Functions
Test Jack Name
Function
NET In
(Network In)
A break-in test jack that allows a signal to be inserted toward
the network by external test equipment.
NET Out
(Network Out)
A break-in test jack that interrupts the signal coming from the
network and allows it to be terminated by the external test
equipment.
EQPT In
(Equipment In)
Model 3150: A break-in test jack that allows a signal to be
inserted toward the terminal equipment (DTE) by external test
equipment.
Model 3151: A non-interruptive test jack that monitors the
signal toward the terminal equipment (DTE).
EQPT Out
(Equipment Out)
Model 3150: A break-in test jack that interrupts the signal
coming from the terminal equipment (DTE) and allows it to be
terminated by the external test equipment.
Model 3151: A non-interruptive test jack that monitors the
signal coming from the terminal equipment (DTE).
MON In
(Monitor In)
Model 3150: A monitor jack that is controlled by the Mon
(Monitor) branch of the menu tree. If it is set to EQPT (the
default), this jack monitors the signal going into the terminal
equipment (DTE). If it is set to NET, this jack monitors the
signal going into the network.
Model 3151: A non-interruptive test jack that monitors the
signal going into the network.
MON Out
(Monitor Out)
Model 3150: A monitor jack that is controlled by the Mon
(Monitor) branch of the menu tree. If it is set to EQPT (the
default), this jack monitors the signal coming from the terminal
equipment (DTE). If it is set to NET, this jack monitors the
signal coming from the network.
Model 3151: A non-interruptive test jack that monitors the
signal coming from the network.
Summary of Contents for 3151
Page 1: ...ACCULINK CSU Models 3150 A4 and 3151 Operator s Guide Document No 3150 A2 GB24 10 March 2001 ...
Page 16: ...About This Guide x March 2001 3150 A2 GB24 10 ...
Page 28: ...2 Installation 2 8 March 2001 3150 A2 GB24 10 ...
Page 40: ...3 Using the Front Panel 3 12 March 2001 3150 A2 GB24 10 ...
Page 66: ...4 Configuration 4 26 March 2001 3150 A2 GB24 10 ...
Page 74: ...5 Security 5 8 March 2001 3150 A2 GB24 10 ...
Page 118: ...8 Testing 8 18 March 2001 3150 A2 GB24 10 ...
Page 120: ...A Front Panel Menu A 2 March 2001 3150 A2 GB24 10 ...
Page 152: ...C Configuration Options C 30 March 2001 3150 A2 GB24 10 ...
Page 168: ...E Pin Assignments E 10 March 2001 3150 A2 GB24 10 ...
Page 192: ...F SNMP MIB Objects F 24 March 2001 3150 A2 GB24 10 ...
Page 218: ...J Equipment List J 2 March 2001 3150 A2 GB24 10 ...