Stage Projector
BP 4 CT
Pani Projection and Lighting Vertriebs GmbH
13
5) Operation
5.1 ) HMI- Lamp
5.1.1) Installation and Replacement of the HMI- Lamp
For operation of the Projector a single ended HMI- Lamp 4000 W is required. Order
Code: 37206
a)
Disconnect the projector from the power source!
b)
Open the quick fastener (4) on the housing with a screw driver. Lift up the housing cover
(5) . A built in safety switch prevents an accidental operation of the unit when the housing is
open.
c)
Lift out the reflector plate and reflector after removing the knurled screw at the other end
of the distance bar.
d)
Insert and / or replace the lamp.
e)
Replace the reflector into the slot of the bottom distance rods and tighten knurled screw.
f)
Close the housing and lock the quick fastener.
ATTENTION:
Do not touch the quartz envelope of the lamp with your fingers during
installation. Finger prints can be burned in !
5.1.2) Lamp Adjustment
Each projector is carefully adjusted at the factory (lamp base, reflector and
condenser). With the high precision manufacturing of halogen lamps, adjustment of
the lamp is rarely necessary. In direction of the optical axis the HMI-lamp can be
brought into another position from the outside on the lower part of the projector by
losening the two screws on the bottom (3) and moving the two screws forwards or
backwards. After finding the best position re-tighten the screws.
5.2) Vertical Adjustment of the Projector
a) Rough Positioning:
For rough positioning, loosen the clamping lever on (1) both sides and move the
projector to the desired position. Re–tighten the lever.
b) Fine Adjustment:
For fine adjustment of the projektor turn the star grip (2) and bring the projector into
the exact position.
5.3) Yoke Assembly for „Standing“
or „Hanging“
Configurations
Separate the support yoke (8) (2 M 10 Nuts) and the telescope rails (7) on both
sides from the projector; Turn the support yoke around 180° such that it is mounted
again as a hanging yoke. Re-connect the telescoping rails
.
POSITION NUMBERS SEEPAGE 5