SMARTZONE UPS INSTALLATION MANUAL
28
Figure 35: Reinsert the Battery Cartridges into the EBP Unit
b. Reinstall the battery baffles the screws (see figure below).
Figure 36: Reinstall Battery Baffles and Screws
c. Reconnect the Battery Cartridge connectors (see figure below). Press each
connector tightly together to ensure a proper connection.
d. The larger battery cartridges connect to connectors 1 and 3, each half of the
smaller battery cartridge connect to connectors 2 and 4.