SMARTZONE UPS INSTALLATION MANUAL
20
b. Align the mounting brackets with the screw holes on the rack and secure the
EBP unit with the supplied 4x Phillips Hex Head M5 screws (see figure below).
Figure 18: Secure the Mounting Brackets to the Rack
Install 3U UPS Units (U05N11V, U05S11V, U06N11V, U06S11V, U06N12V, U06S12V,
U10N11V, U10S11V, U10N12V, U10S12V, U10N32V, U10S32V, U15N32V, U15S32V,
U20N32V, U20S32V)
1. Install the URMKIT2 rail kit:
a. Install the front side of the rail kit with 2x Phillips Pan Head M5 screws (see
figure below) on each rail. Do not tighten the screws.
Figure 19: Install the Front Side of Rails
b. Adjust the rail size according to the depth of the rack
c. Install the rear side of the rail kit with 3x Phillips Pan Head M5 screws (see
figure below) on each rail.