14
●
Pre
-operation check
•
Check if all connections are correct andcomplete.
•
Check if settings of the switches on the P.C. Board are correct
•
Check if wire is set to the wirefeeder.
●
Turning
on power
•
Turn off the power to the distributionbox.
•
Turn on the power switch of thisproduct.
5.7 Termination processing (steps after welding operation)
●
Shutting off gas
•
Close the main valve of the gasbottle.
•
Perform the “gas purge” to take the residual pressure out of thepipe.
●
Shutting off power
Important
To allow the inside of this product to cool down, turn the power off at least 5
minutes after the completion of welding operations.
•
Turn off
“
POWER
”
switch.
•
Turn off the power to the distribution box.
Summary of Contents for YC-400TX4
Page 2: ......
Page 17: ...11 5 2TIG PLUSE TIG WATER ...
Page 35: ...29 12 Parts list 12 1 Parts list for YC 400TX4 Front view 1 3 4 5 2 6 ...
Page 36: ...30 Right View Left view 7 12 11 13 19 20 10 8 9 21 14 15 18 16 17 23 22 26 24 27 25 ...
Page 38: ...32 13 Outline drawing ...
Page 39: ...33 14 Circuit diagram ...