WARNING
15. Maintenance
Guide
In order to ensure optimal performance of the unit, seasonal inspections on the unit, external filter and field wiring
have to be carried out at regular intervals. This maintenance should be carried out by authorized dealer.
1 Water
pressure
Water pressure should not lower than 0.05 MPa (with inspects the pressure gauge). If necessary add tap
water into tank unit. Refer to tank unit installation instruction for details on how to add water.
2 Pressure relief valve
o
Take out the cover with remove the mounting screw for access to the pressure relief valve.
o
Move the lever into a horizontal position to open the valve.
o
If you do not hear a clacking sound (due to water drainage), contact your local authorized dealer.
o
Push the lever back down after you have finished the check.
o
If the water continues to drain from the unit switch off the system and contact your local authorised
dealer.
o
Reinstall the cover with tighten the mounting screws properly, if the pressure relief valve is functioning
normal.
3 Air purge valve
Air purge valve must be installed at all high points in a closed water circuit system.
An automatic air purge valve is provided inside the indoor unit. To automatically purge the air from the
system, turn the plug on the air outlet anticlockwise by one complete turn from fully closed position.
Excessive air is automatically purged if the plug is kept in this position.
4 RCCB
Ensure the RCCB set to “ON” condition before check RCCB.
Turn on the power supply to the Mono bloc unit.
This testing could only be done when power is supplied to the Mono bloc unit.
Be careful not to touch parts other than RCCB test button when the power is supplied to Mono bloc unit. Else,
electrical shock may happen.
o
Push the “TEST” button on the RCCB. The lever would turn down and indicate “0”, if it functions normal.
o
Contact authorized dealer if the RCCB malfunction.
o
Turn off the power supply to the Mono bloc unit.
o
If RCCB functions normal, set the lever to “ON” again after testing finish.
Summary of Contents for WH-MDC06E3E5
Page 10: ...10 4 Location of Controls and Components 4 1 Mono Bloc Unit ...
Page 11: ...11 4 1 1 Main Components ...
Page 13: ...13 ...
Page 14: ...14 ...
Page 15: ...15 4 1 3 Weekly Timer Setting ...
Page 16: ...16 4 1 4 Setting Up The Special Functions ...
Page 17: ...17 5 Dimensions 5 1 Mono Bloc Unit ...
Page 18: ...18 6 Refrigeration and Water Cycle Diagram ...
Page 19: ...19 ...
Page 20: ...20 7 Block Diagram ...
Page 21: ...21 8 Wiring Connection Diagram ...
Page 22: ...22 ...
Page 23: ...23 9 Electronic Circuit Diagram ...
Page 24: ...24 ...
Page 25: ...25 10 Printed Circuit Board 10 1 Water System 10 1 1 Main Printed Circuit Board ...
Page 26: ...26 10 1 2 Solar Printed Circuit Board Optional ...
Page 27: ...27 10 2 Refrigerant System 10 2 1 Main Printed Circuit Board ...
Page 28: ...28 10 2 2 Capacitor Printed Circuit Board 10 2 3 Noise Filter Printed Circuit Board ...
Page 29: ...29 11 Installation Instruction Mono Bloc Unit Dimension Diagram ...
Page 30: ...30 Main Components ...
Page 39: ...39 Cool Mode Operation Time Chart 12 1 4 Cool Tank Mode Operation ...
Page 41: ...41 ...
Page 42: ...42 ...
Page 48: ...48 ...
Page 49: ...49 ...
Page 59: ...59 Solar Priority Not Set Heat Tank Mode Heating Priority Set ...
Page 60: ...60 Tank Mode Solar Priority Set Solar Priority Not Set ...
Page 109: ...109 17 3 To Remove The Cabinet Rear Plate 17 4 To Remove Pressure Gauge ...
Page 110: ...110 17 5 To Remove RCCB 17 6 To Remove Transformer and Electronic Controller Board ...
Page 117: ...117 18 4 Hydraulic Pump Performance ...
Page 119: ...119 ...
Page 122: ...122 19 2 WH MDC06E3E5 WH MDC09E3E5 Water System ...