Lever of Cassette Up Ass’y set incorrectly.
A. When installing the Front Panel Ass’y, swing the Cassette Door-
Lid all the way open until the Cassette Door tab clears the
Opener Lever.
B. Make sure that all locking tabs are aligned properly.
Then, press the Front Panel straight in.
Fig. D3
3. Removal of VCR Chassis Unit & Frame
When removing the VCR Chassis Unit & Frame, push the 2
Locking Tabs to release. Then, slide the VCR Chassis Unit &
Frame to front side.
Installation of VCR Chassis Unit
When installing 2 Screws (460), slide the Holder Unit of the
Cassette Up Ass'y (Refer to "
WHEN LOADING WITHOUT A
CASSETTE
" in Service Notes) to tighten screws. Then, slide it
back to the EJECT Position.
4. Installation of Mechanism Chassis and Cassette Up Ass’y onto
Main C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECT Position.
Fig. D4
25
Summary of Contents for PVD4742 - DVD/VCR DECK
Page 1: ...ORDER NO MKE0201800C1 B3 DVD VCR DECK PV D4742 SPECIFICATIONS 1 ...
Page 23: ...Fig D2 23 ...
Page 27: ...5 2 1 Disassembly Reassembly Method 5 2 2 Inner Parts Location Fig J1 1 27 ...
Page 28: ...5 2 3 EJECT Position Confirmation Fig J1 2 28 ...
Page 54: ...7 SCHEMATIC DIAGRAMS 54 ...
Page 56: ...10 2 MECHANISM BOTTOM SECTION 56 ...
Page 57: ...10 3 CASSETTE UP COMPARTMENT SECTION 57 ...
Page 58: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 58 ...
Page 59: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 59 ...