Assembly of Relay Gear and UD Drive Gear
Step 25: Install relay gear and UD drive gear respectively.
•
Assembly of Pulley Gear and Belt
Step 26: Install pulley gear.
Step 27: Install belt.
•
Assembly of OC Drive Gear
Step 28: Install OC drive gear.
•
Assembly of Pitch Plate
Step 29: Install the pitch plate, ensure all the catches hooked
onto the mecha base assy.