•
Assembly of Clamp Plate Assy
Step 27: Fix the clamp plate assy align to both guides, make
sure the catch is fully catched.
•
Assembly of Tray Stoppers
Step 28: Fix the tray stoppers.
10.3.2. Assembly of Mecha Base Unit
Parts
•
Assembly of Mecha P.C.B. and Sensor P.C.B.
Step 1: Align the component of Mecha P.C.B. to the groove.
46
CR14
Summary of Contents for CR14
Page 2: ...1 Mechanism Overview 2 CR14 ...
Page 7: ...7 CR14 ...
Page 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Page 14: ...8 2 1 Flow operation 14 CR14 ...
Page 15: ...15 CR14 ...
Page 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Page 60: ...CR14 60 ...
Page 64: ...CR14 64 ...
Page 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Page 66: ...CR14 66 ...