Step 2: Ensure all catches are hooked to the Mecha P.C.B. and
Sensor P.C.B. then fix 2 screws.
•
Assembly of Open Switch Lever
Step 3: Install open SW lever.
•
Assembly of All Trigger Lever
Step 4: Ensure all trigger lever’s boss seated properly onto the
groove.
Step 5: Ensure the “U” shape of the all trigger lever snap to the
boss.
47
CR14
Summary of Contents for CR14
Page 2: ...1 Mechanism Overview 2 CR14 ...
Page 7: ...7 CR14 ...
Page 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Page 14: ...8 2 1 Flow operation 14 CR14 ...
Page 15: ...15 CR14 ...
Page 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Page 60: ...CR14 60 ...
Page 64: ...CR14 64 ...
Page 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Page 66: ...CR14 66 ...