Step 22: Slot the traverse unit assy onto the UD base as arrow
shown.
Note:
Ensure the bosses fix exactly onto the guides.
Step 23: Push the guide to lock the traverse unit assy in.
•
Assembly of Change arm
Step 24: Insert service jig into the traverse hole, rotate the gear
clockwise.
Note:
Ensure the groove of the TRV slide plate assy stop at the
position shown.
Step 25: Install the change arm to the groove of the TRV slide
plate assy.
Step 26: Push the TRV slide plate assy as arrow shown to lock
the change arm.
45
CR14
Summary of Contents for CR14
Page 2: ...1 Mechanism Overview 2 CR14 ...
Page 7: ...7 CR14 ...
Page 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Page 14: ...8 2 1 Flow operation 14 CR14 ...
Page 15: ...15 CR14 ...
Page 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Page 60: ...CR14 60 ...
Page 64: ...CR14 64 ...
Page 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Page 66: ...CR14 66 ...