6.2. Description of tray selection operation
1. The loading motor turns in the clockwise direction and the rotation is transmitted via the belt, the pulley gear also turns clockwise.
2. The relay gear turns counter clockwise.
3. The change gear turns clockwise.
4. The cam gear turns counter clockwise.
5. The UD drive gear turns counter clockwise engages UD cam L guide drives UD connection turns counter clockwise, UD cam R
guide is driven to move UD base unit down.
(The operation of the UD base unit up is the opposite of that for the UD base unit down.)
9
CR14
Summary of Contents for CR14
Page 2: ...1 Mechanism Overview 2 CR14 ...
Page 7: ...7 CR14 ...
Page 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Page 14: ...8 2 1 Flow operation 14 CR14 ...
Page 15: ...15 CR14 ...
Page 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Page 60: ...CR14 60 ...
Page 64: ...CR14 64 ...
Page 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Page 66: ...CR14 66 ...