8 CR14 Mechanism Reliability
Purpose: To test the CR14 mechanism unit operation by using the Reliability P.C.B. before installation into the main unit.
8.1. Setup Connection
Below diagram shows the set-up necessary to carry out the reliability of mechanism.
Equipments required for the set up preparation:
- Power supply
- Reliability P.C.B. (RFKZCR14)
12
CR14