•
Assembly of Load Lever
Step 7: Push as arrow shown to ensure the boss seated on
point (A).
Step 8: Ensure both bosses align.
Step 9: Install load lever as shown, make sure the catch is fully
catched.
•
Assembly of Switch Slider
Step 10: Push the guide until it stop.
Step 11: Fix the switch slider to the catches.
Note:
Ensure the switch slider spring is fixed at the back of the
switch slider.
Step 12: Press down the switch slider and make sure it is fully
catched onto the UD base.
42
CR14
Summary of Contents for CR14
Page 2: ...1 Mechanism Overview 2 CR14 ...
Page 7: ...7 CR14 ...
Page 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14 ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14 ...
Page 14: ...8 2 1 Flow operation 14 CR14 ...
Page 15: ...15 CR14 ...
Page 57: ...Step 8 Install OC assy Step 9 Install OC spring 57 CR14 ...
Page 60: ...CR14 60 ...
Page 64: ...CR14 64 ...
Page 65: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14 65 ...
Page 66: ...CR14 66 ...