Page 1-75
REGULAR
MAINTENANCE
1
444C-E-MMA01-A09-04
Check Every 3000 Hours (Once Six Months)
2.
Exchanging the board transfer roller.
Hold the nut on the rear side and exchange the board transfer roller of the board conveyor.
1.
Remove the board transfer roller
using a hexagon wrench.
2.
Set the new board transfer roller.
3.
Setting the board transfer belt
1.
Check the transfer direction of the
belt.
∗
Fit the arrow direction printed on the belt to the
transfer direction.
2.
Insert the belt into the gap between
the roller and the guide.
3.
Put the belt to the driving pulley and
the tension pulley.
4.
Check the belt tension.
For checking and adjusting the tension:
1-4-5 Checking and Lubricating the Board
Transfer direction
Arrow
3Y3C-082P
443C-328E
∗∗∗∗∗
This picture shows the one for CM201/202-DH.