Page 1-74
1-6
Check Every 3000 Hours (Once Six Months)
1-6-1
Exchanging the Board Transfer Belt and Roller
The board transfer belt and board transfer roller on the board conveyor must be exchanged regu-
larly.
∗
For DU/DHU specifications, it is necessary to remove the feeder base cover for the maintenance.
1-2-3 Setting and Removing the Feeder Base Cover (Only for DU/DHU Specifications)
1.
Removing the board transfer belt
∗
You may store the removed belt as an spare. If you do not store it, cut it off with a nipper.
1.
Turn OFF the power.
2.
Remove the belt by pulling it out.
444C-E-MMA01-A09-04
Tools
Allen wrench and push-pull gauge
Required time
15 minutes
REL
EA
SE
TR
IP
O
F
F
ON
RE
S
E
T
3Y3C-081P