119
13.4 New installation, Relocation, Repairing of Refrigerant Cycle System The
Procedures
Operation testing
New
Installation
Relocation
Repairing refrigerant cycle
Pump down
Refrigerant recovery
Prevention of impurity
Leakage checking
Insertion of refrigerant
• Dismantling indoor / outdoor units
• Repairing by brazing
Evacuation (Air purging) new installation and relocation for at or
more than 15 minutes, re-charging at or more than 60 minutes
Indoor / outdoor units and piping
• Displacing pipes and wires, and displacing indoor / outdoor units
・
Indoor / outdoor units installation and piping, and wiring
Removal