Mount one half of the clamping fixture on one side of the pipe using the straps or chains provided. This half of the
clamping fixture should align with the first and third lines drawn on the pipe.
6.
Mount the other half of the fixture on the opposite side of the pipe. The clamping fixture should now look like
Figure 6 below.
WARNING!
Proper grounding of the clamping fixture (using the grounding lugs provided) is required, to prevent
the possibility of electric shock and to meet CE Mark compliance (see Figure 6 below).
Figure 6: CFT-PI Clamping Fixture, Order of Installation (top view of pipe)
2nd half, CFT-PI
Clamping Fixture
1st half, CFT-PI
Clamping Fixture
External Ground for
CE Mark Compliance
CE Mark Compliance
External Ground for
Summary of Contents for CTF878
Page 1: ...panametrics com Flow 910 254U Rev A AUG 2021 Model CTF878 Clamp On Tag Flowmeter Startup Guide...
Page 2: ......
Page 4: ...ii no content intended for this page...
Page 6: ...Warranty iv Model CTF878 Startup Guide no content intended for this page...
Page 8: ...Contents vi Model CTF878 Startup Guide...
Page 76: ...Model CTF878 Startup Guide 68...
Page 96: ...Appendix A 88 Model CTF878 Startup Guide...
Page 99: ...Model CTF878 Startup Guide 91 Appendix B 9 21 10 22 11 23 12 24...
Page 100: ...Appendix B 92 Model CTF878 Startup Guide...
Page 104: ...Index 96 Doc Tittle Manual Type...
Page 106: ......
Page 107: ......