Document #: 020-17475-00 Revision: E
Page #: 23 of 63
2.
Make sure that
the universal latch is installed in the correct position to match the rail
port intended for connection.
See Figure 19 for corresponding
latch and port positions
.
Pull the latch back towards the handle as shown in Figure 20.
3.
Carefully press down on the drive handle and raise the front wheels off the ground (as
shown on the second step of the Figure 24)
4.
Align the guide bearings on the drive port with the dolly guide rails.
5.
Roll the superconductive drive unit along the rails all the way until the bearings rest in
the well located at the end of the rails.
6.
Using the drive unit handle, raise the superconductive drive unit to an upright position.
While holding the drive unit in this position shift the latch toward the dolly/tank so that
the cross bar rests on the grooves in the guide rails (as shown in the fourth step of Figure
24).
Figure 24:
Coupling of superconducting drive unit
DO NOT
attempt to move the Dolly by the Drive Unit Handle when assembled as it may
damage the superconducting drive unit. Always use the
dolly/container handle
to
move the Dolly or Dolly/Container-Drive Unit assembly.
DO NOT
put fingers under the universal latch when locking the Drive Unit onto the
Dolly or any container mounted rail port.