3-26
Machine Maintenance Procedures
Power Board Removal
0
Prerequisite:
Upper Cover Removal
1.
Find power board (B) on upper cover. (
Figure 3-20
)
2.
Remove power board FFC (Flat Flex Cable) (A) from upper cover. (Figure 3-22)
3.
Remove one (1) screw (B). (Figure 3-22)
Figure 3-22.
Power Board
4.
Remove power board from upper cover.
Power Board Installation
0
1.
Install power board (B) on upper cover. (
Figure 3-20
)
2.
Install power board FFC (A) on upper cover. (Figure 3-22)
3.
Install and secure one (1) screw (B) to lower cover. (Figure 3-22)
4.
Install upper cover.
ID
Size
Quantity
Screw Type
B
M2.5*3.0
1
B
A
Summary of Contents for EasyNote TK13BZ
Page 1: ...Packard Bell EasyNote TK11BZ TK13BZ SERVICEGUIDE...
Page 4: ...iv...
Page 10: ...x...
Page 11: ...CHAPTER 1 Hardware Specifications...
Page 14: ...1 4...
Page 53: ...CHAPTER 2 System Utilities...
Page 80: ...2 28 System Utilities...
Page 81: ...CHAPTER 3 Machine Maintenance Procedures...
Page 84: ...3 4...
Page 118: ...3 38 Machine Maintenance Procedures ID Size Quantity Screw Type B ICW50 CPU Thermal Screw 4...
Page 135: ...CHAPTER 4 Troubleshooting...
Page 162: ...4 28 Troubleshooting...
Page 163: ...CHAPTER 5 Jumper and Connector Locations...
Page 172: ...5 10 Jumper and Connector Locations...
Page 173: ...CHAPTER 6 FRU Field Replaceable Unit List...
Page 174: ...6 2 Exploded Diagrams 6 4 FRU List 6 6 Screw List 6 21...
Page 194: ...6 22 FRU Field Replaceable Unit List...
Page 195: ...CHAPTER 7 Model Definition and Configuration...
Page 196: ...7 2 Packard Bell EasyNote TK11BZ TK13BZ 7 3...
Page 200: ...7 6 Model Definition and Configuration...
Page 201: ...CHAPTER 8 Test Compatible Components...
Page 202: ...8 2 Microsoft Windows 7 Environment Test 8 4...
Page 213: ...CHAPTER 9 Online Support Information...
Page 214: ...9 2 Introduction 9 3...
Page 216: ...9 4 Online Support Information...