18
5 Scope of Delivery and Accessories
5.1 Scope of delivery
•
1 pc. 757B35=* MyoEnergy Integral
•
1 pc. Instructions for use (qualified personnel)
5.2 Accessories
•
2 pc. lamination dummy
•
1 pc. lamination dummy – charging receptacle
•
1 pc. drilling template for charging receptacle
Only included with 757B35=0 and 757B35=5 MyoEnergy Integral
•
1 pc. electronics lamination dummy
Only included with 757B35=1 and 757B35=3 MyoEnergy Integral
•
2 pc. battery installation aid
•
2 pc. Hook and loop closure strap (only included in the scope of delivery for the 757B35=3
MyoEnergy Integral)
•
4 pc. countersunk head screws
Required accessories for operation
•
757L35 MyoCharge Integral
6 Preparing the product for use
6.1 Laminating instructions
The product must be properly installed in the socket. Please note the corresponding technical
information.
6.2 Fastening the MyoEnergy Integral in the outer socket
6.2.1 Installing the 757B35=0 / 757B35=5 battery
1) Fasten the batteries and electronics in the outer socket with double-sided adhesive tape.
2) Slide the inner socket into the outer socket and screw them together (see fig. 4).
6.2.2 Installing the 757B35=1 / 757B35=3 battery
Assembly of the separate battery units
1) Determine the battery positions using the installation aids.
INFORMATION: Maintain sufficient distance between the installation aids/batteries
(see fig. 5).
2) Mark the hole positions on the socket and drill them with the drill bit.
3) Pull the double-sided adhesive tape off the installation aids and apply it to the battery (see
fig. 7).
4) Secure the installation aid and battery with the hook-and-loop closure strap (757B35=3) or
adhesive tape (757B35=1).
INFORMATION: Lay the hook-and-loop closure strap into the groove on the installa
tion aid (see fig. 8). The overlapping ends of the hook-and-loop closure strap have to
be up against the battery.
5) Use the countersunk head screws to screw the batteries to the socket.
Installation of the assembled battery units
1) Fasten the batteries and installation aid with the double-sided adhesive tape (see fig. 10).
2) Wrap the installation aid and batteries with the hook and loop closure strap (757B35=3) or
adhesive tape (757B35=1).
INFORMATION: Lay the hook and loop closure strap into the groove on the installa
tion aid.
Summary of Contents for 757B35 0
Page 2: ...1 2 3 4 5 6 7 8 2...
Page 3: ...9 10 3...
Page 126: ...126 757B35 0 757B35 1 757B35 3 3 3 1 3 2 132 3 3 3 4 Ottobock 4 4 1 4 2 1 2...
Page 127: ...127 4 3 Ottobock...
Page 128: ...128 5 Ottobock DermaClean 453H10 1 Ottobock 4 4 132...
Page 131: ...131 2 757B35 3 757B35 1 7 7 1 1 1 7 2 1 134 2 7 3 1 2 LED 7 4...
Page 135: ...135 1 2020 12 22 MyoEnergy Integral 757B35 2 2 1 2 1 1 1 2 3 1 2 1 2 3 2 1 2 3 3 1 2 3 4 1 2 5...
Page 136: ...136 757B35 0 757B35 1 757B35 3 3 3 1 3 2 143 3 3 3 4 Ottobock 4 4 1 4 2 1 2...
Page 137: ...137 4 3 Ottobock...
Page 138: ...138 5 Ottobock DermaClean 453H10 1 Ottobock 4 4...
Page 139: ...139 143 Ottobock Bluetooth WLAN...
Page 141: ...141 4 757B35 3 757B35 1 8 5 1 10 2 757B35 3 757B35 1 7 7 1 1 1 7 2 1 144 2 7 3 1 2 7 4...
Page 147: ...147 4 2 1 1 2 4 3...
Page 148: ...148 5 453H10 1 453 10 1 4 4...
Page 149: ...149 152 CT MRI WiFi...
Page 151: ...151 2 757B35 3 757B35 1 7 7 1 1 1 7 2 1 154 2 7 3 1 1 2 LED 7 4...
Page 154: ...154 11 2 11 2 1 LED LED 50 LED 11 2 2 1 2 LED 3 7in1 9E420 1 2 2...
Page 155: ...155...