Appendix A: Installing the SE 200 as an attachment
Figures 10 through 15 indicate examples of attachment options to mechanical
level recorders. Each illustration indicates the parts of the installation accessories
used.
Select the illustration that applies to you and proceed as follows:
Fastening the SE 200
䡵
When using a carrier unit (Figure 14 + 15): Fasten the carrier rail to the float
pulley of the SE 200 using two recessed-head bolts; attach the carrier base to
the opposite float pulley (mechanical level recorder) using double-sided adhesive
strips; insert carrier pin into carrier base.
䡵
Depending on the design of the level recorder, fasten the SE 200 using either
– connecting angle A with a friction disc fitted underneath or
– screw it onto connecting angle B (
M
6 x 25 + washers); attach connecting
angle B to a flat base using double-sided adhesive strips (use screws if
necessary).
䡵
Place float cable over both float pulleys or couple the float pulleys via the
carrier pin and carrier rail.
Then turn to Chapter 5.
Co
nn
ecti
n
g a
n
gle A
+
f
rictio
n
disc
M 6 x 25 + washer
SE 200
Guide
M 6 x 18
to datalogger
Fig. 10: Attachment example to an OTT
horizontal Type X level recorder.
Additional float cable guide
via SE 200 float pulley.
Tighten the guide roller screw only slightly!
Required parts:
Connecting angle A
+ friction disc
Guide roller
17
Summary of Contents for SE 200
Page 1: ...English Operating instructions Shaft Encoder OTT SE 200 ...
Page 2: ...We reserve the right to make technical changes and improvements without notice ...
Page 25: ......
Page 26: ......
Page 27: ......