Page | 16
Move the boiler to the place of installation.
During transport, make sure not to damage the boiler.
If possible, transport the boiler secured on the pallet to the place of installation.
Unpack the boiler.
Dispose of the packaging in accordance with environmental protection requirements.
5.2. Installation
The Pellet Comfort boiler (if not otherwise requested by the customer) is delivered, depending on the
power and the selected tray, on one or two wooden pallets. The burner is fixed to the device. The tray is
delivered folded. The boiler must be connected to the tray as shown in the picture.
Ensure that the tray overheating sensor is inserted into a thin tube secured to the fireplace tube (stainless
steel chimney-elbow). Connect the chimney with a flexible tube, and then connect the tube with the tray
outlet.
DANGER: Putting any objects into the tray during operation of the boiler can cause serious injuries.
The tray should be covered from the top with the cover. It is forbidden to insert any objects into the tray
during feeder operation, as this may cause disability. Remember to fill up the tray with pellet before
operating the burner with the operating mode on the display set to “STOP”.
After installing the feeder inside the tray and filling up with pellet, disconnect the flexible pipe from the
burner and check the feeder usage.
In order to determine the correct amount of the fuel quantity, use the
following formula: 0.2 kg / h pellet times the amount of kW of device power. E.g .: 0.2 x 24 = 4.8. The
obtained result will give us in kilograms per hour (kg / h) the information we need the amount of fuel from
obtaining the desired thermal power in kW. The burner, when working in a given cycle, should give the
amount of fuel for an hour that comes out of the formula. It is recommended that the feeder's working
cycle should not exceed 75%. So if the feeder gives, for example, 25 kg in a fixed cycle, set the FUEL FOR
MAX POWER at 19% (4.8: 25 = 0.19).
5.3. Installation conditions
In order to install the boiler, certain conditions (at the site) must be met. The user and the installation
company are responsible for meeting these conditions.
The installation site must meet the following conditions:
• Safe operation of the boiler must be ensured at the site of installation.
• The site of installation must be protected from frost.
• Installation and use of the boiler are allowed only in rooms with constant and proper ventilation.
• Ensure the supply of a sufficient amount of air.
• The floor under the boiler must have sufficient bearing capacity, and must be levelled and flat.
• The boiler can be placed only on a non-combustible surface.
The chimney must meet the following conditions:
• The chimney and exhaust gas connection must comply with applicable regulations.
• The chimney must be insensitive to moisture.
5.4. Distance from the walls