5.12.4. Closing operation from isolating position
Initial conditions:
Circuit-breaker open, earthing
switch open.
1.
Turn the actuating shaft selector clockwise.
Figure 5.92.
Selector detail
2.
Insert the lever in the spring charge shaft and charge
the springs by turning clockwise 240º.
Figure 5.93.
Lever turn detail
Figure 5.94.
Spring charge indicator
IG-078-EN version 12; 23/04/2020
97
General Instructions
cgmcosmos
: Medium-voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard
Recommended sequence of operations
Summary of Contents for velatia cgmcosmos
Page 119: ......