5.13.2. Actuating lever
Figure 5.103.
Detail of lever for the metering cubicle with earthing switch
5.13.3. Earthing operation
1.
Connect the earthing switch for the protection cubicle
adjacent to the metering cubicle, in accordance with
instructions described in the documentation for this
cubicle.
Figure 5.104.
Example of circuit-breaker cubicle earthing switch connected
IG-078-EN version 12; 23/04/2020
102
Recommended sequence of operations
General Instructions
cgmcosmos
: Medium-voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard
Summary of Contents for velatia cgmcosmos
Page 119: ......