Contents
X
Ocean TRx™ 4500 Installation and Operations Manual
Graphics Data Logger .................................................................. 9-10
Using the Graphic Data Logger............................................. 9-10
Configuring the Graphic Data Logger .................................... 9-10
Logging Data with the Graphic Data Logger ........................... 9-11
Analyzing and Saving Logger Data ....................................... 9-12
Calibrating and Activating Noise Floor Correction............................. 9-14
Calibrating the Noise Floor .................................................. 9-14
Typical Noise Floor Curves ................................................... 9-16
Activating Noise Floor Correction .......................................... 9-18
Monitoring System Voltage and Temperature Test Points ................. 9-19
Monitoring the MtsVLink Work Session ........................................... 9-19
System Messages Log .................................................................. 9-20
Downloading the Status Dump File ................................................ 9-21
Viewing Software Version Details .................................................. 9-22
Appendix A: Technical Specifications ....................................................... A-1
Appendix B: MIB for the Antenna Control Unit ......................................... B-1
Appendix C. Status Messages .................................................................. C-1
Messages (Informative) ....................................................................... C-1
Warning Messages ............................................................................... C-2
Appendix D: BDE Equipment Pinout ......................................................... D-1
Modem M&C Connector pin-out ............................................................. D-1
SYNCHRO & SBS Compass Connector pin-out ......................................... D-1
NMEA Compass Connector pin-out ......................................................... D-3
Appendix E: Preparing the ADE-BDE Cable .............................................. E-1
Appendix F: Pre-Installation Checklist..................................................... F-4
Appendix G: Installation Checklist ........................................................... G-1
Please check the state of the G-Shock detectors and mark their color: ....... G-1
Crate Visual Inspection ........................................................................ G-2
Appendix H: Commissioning Checklist ..................................................... H-1
Maintenance Access ............................................................................. H-1
Other Considerations ........................................................................... H-2