Appendix F: Pre-Installation Checklist
4
Ocean TRx™ 4500 Installation and Operations Manual
Appendix F: Pre-Installation Checklist
Dear customer, please review and fill out this document, in accordance with the
OceanTRx™4-500 Installation and Operation Manual
. For any assistance or questions,
please contact Orbit Service team at
Customer and Ship Information
Customer
Name
Country
P.O No.
Contact Name
Phone No.
Vessel Name
Vessel Size
Vessel Type
Sailing Area
Site Survey
Thorough on
‐
board ship survey was conducted
Required system lifting harness and crane available
Required Radome lifting harness and crane available
UPS – On-line or Line Interactive type
Power source available within the range of 90-220 VAC
Location Considerations
Mechanical Stability
Stable flat surface
Natural resonance frequency of above 30 Hz
Support for 600 Kg
Maintenance Access
Radome mounted at a height of at least 1.2m above deck