Chapter 2
Preparing to Install the Server
2-7
FIGURE 2-4
SPARC Enterprise M5000 Server With Dual-power Feed Connection
2.2.1.2
Grounding
The system is shipped with grounding-type (three-wire) power cords. Always
connect the cords into grounded power outlets. Contact your facilities manager or a
qualified electrician to determine what type of power is supplied to your building.
No additional earth grounding is necessary but it may be added if desired.
Circuit
breaker
Circuit
breaker
PSU#0 PSU#1PSU#2PSU#3
#3
#2
#1
#0
Summary of Contents for SPARC Enterprise M4000
Page 4: ......
Page 8: ...viii SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Page 14: ...xiv SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Page 26: ...2 10 SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Page 58: ...A 14 SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...