OPTIMUM
M A S C H I N E N - G E R M A N Y
Assembly and commissioning
15 / 06 / 2011
Page 21
Assembly and commissioning Digital position display DPA 2000/ DPA 2000S ; Version 2.1.2
©
201
1
GB
3.5
First commissioning
WARNING!
When first commissioning the device by inexpert personal you will endanger persons or
the device.
We do not take any liability for damages caused by a commissioning which is not being
performed correctly.
3.5.1
Connecting the measuring gauges
The measuring gauges are firmly connected to the rear side of the device using couplings.
Slightly press the plug of the path-measuring system on the coupling.
In doing so, turn the plug until the inner guiding pin of the plug has cammed in the groove of
the coupling.
Firmly bolt the screw cap of the plug on the coupling.
3.5.2
Connecting the power supply
The device is connected using a power cable. The coupling for the power cable is at the rear
side of the device.
The plug of the power cable is provided for shock-proof sockets.
Please observe the technical indications regarding the electrical connection of the device.
„The rear panel“ on page 9
3.5.3
Switching on the device
The device will be switched on using the main switch at the rear side.
CAUTION!
Only switch on the device by using the main switch if the measuring gauges are con-
nected and the power cord is connected to the electrical power supply.