Lubrication
With the first lubrication and greasing your new machine, oil in
the gearbox is filled. Once these operations have been carried
out, the machine can be started up.
The oil tank of the gearbox must be filled to half way up the
sight glass. Filling quantity about 3 liters
The oil must be changed 200 hours after being filled for the
first time, then after every 2000 operating hours.
Use the oil types recommended in the reference table
Lubricant on page 63. This table can be used to compare
the characteristics of each different type of oil of your
choice.
3.6
First commissioning
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
WARNING!
First commissioned of the milling machine by inexperienced personnel constitute a risk
to personnel and equipment.
We do not accept any liability for damages caused by incorrectly performed
commissioning.
3.6.1
Warming up the machine
ATTENTION!
If the drilling milling machine and in particular the spindle is immediately operated at
maximum load when it is cold it may result in damages.
If the machine is cold, e.g. directly after having transported the machine, it should be warmed
up at a spindle speed of only 500 1/min for the first 30 minutes.
3.6.2
Power supply
Connect the electrical supply cable.
CEE-400V-16A plug drilling milling machine
ATTENTION!
Ensure that all 3 phases (L1, L2, L3) are connected correctly.
Most of the defects on motors are caused by wrong connection, e.g. if the neutral