5
The selection of installation place and notice of the air conditioner unit
☆
The earthing should reliably connected with the specific earthing equipment in the architecture, and this should be
done by the professional personnel. There must be creepage protection switch and air switch with enough capacity in
the rated circuit (reference the following form). The air switch should maintain the functions of magnetic de-buckle
and heat de-buckle to assure the protection when circuit-short and overload happen.
●
Earthing requirement
☆
The air conditioner is class I appliance, so please do take the reliable measurement to earthing.
☆
The yellow and green cord in the air conditioner unit is earthing cord which cannot be used for other purpose, and cut
off, as well as fixed up with screw. Otherwise, it would lead electric shock.
☆
The reliable earthing terminal must be offered by the user power. And please don’t connect the earthing cord to the
following place:
①
Tap water pipe
; ②
Coal gas pipe
; ③
Ejection pipe
; ④
The place that is consider to be not reliable by the
professional personnel.
●
The attachment used for installation
Every attachment used for installation of the indoor and outdoor unit please refer to the packing list in every
individual package carton.
Summary of Contents for OV-R224P/Na-M
Page 35: ......