![background image](http://html.mh-extra.com/html/omron/v400-r2-series/v400-r2-series_connection-manual_741434038.webp)
7. Connection Procedure
35
4
The tree under NewPLC1
expands. Select the Serial
Communications Unit (SCU[0] is
selected in the right figure).
5
Select the Trace 2 Icon (
) on
the Project Window.
Confirm that Trace 2 is
highlighted as shown in the right
figure.
*Trace 2 corresponds to port 2 of
the Serial Communications
Unit.
6
Select
Start Trace
-
One Shot
Trace
from the PLC Menu.
7
Confirm that the status of Trace
2 in the Project Window was
changed to One-shot Trace
Running.