![background image](http://html.mh-extra.com/html/omron/v400-r2-series/v400-r2-series_connection-manual_741434023.webp)
7. Connection Procedure
20
8
The Task Settings Tab is
displayed in the Edit Pane. Click
the
Program Assignment
Settings
Button and confirm
that Program0 is set under
PrimaryTask.
9
Select
Check All Programs
from the Project Menu.
10
Confirm that "0 Errors" and "0
Warnings" are displayed in the
Build Tab Page under the Edit
Pane.
11
Select
Rebuild Controller
from
the Project Menu.
A confirmation dialog box is
displayed. Check the contents
and click the
Yes
Button.
A screen is displayed indicating
the conversion is being
performed.
12
Confirm that "0 Errors" and "0
Warnings" are displayed in the
Build Tab Page.