2 Installation and connection
2-2 Installation
BU5002R/BU3002R/BU3002RH
40
■ Vertical installation
Use the stands for vertical layout included with the product. If stands for vertical layout are
not used, the UPS may fall down due to vibration, etc., which is dangerous.
⚫
Items in the package used during vertical installation
Fittings for vertical layout
BU5002R
BU3002R
BU3002RH
Stands for vertical layout
6
4
Screws for stand for vertical
layout (M4)
12
8
⚫
Installation procedure
When installing in the vertical layout, first remove the battery from the main unit. At the time
of shipment of the BU5002R, the UPS main unit and the battery are packaged separately,
so the battery is not in the main unit.
See “4-4 Replacing the battery” for the procedure for removing and installing the battery.
<BU5002R>
1.
Remove the battery. S
ee “4-4 Replacing the battery” for the procedure for
removing the battery.
At the time of shipment, the UPS main unit and the battery are packaged
separately, so the battery is not in the main unit.
2.
Remove the 2 handles on the left side surface when viewed from the front using a
screwdriver. Each handle is fastened by 5 screws.
Screws to remove
Screws to remove
3.
Stand the UPS upright. See “2-2 Installation” for the installation orientation.
Be careful not to overturn the UPS without a battery because the center of gravity