
4 Maintenance and Inspection
4-1 Checking the battery
80
200
280
400
480
600
680
800
0
0
20
40
60
80
100
120
140
160
180
200
40
120 160
240
320 360
440
520 560
640
720 760
BA100T/BA100R
BA75T
B
ac
kup t
im
e (
M
inut
es
)
Capacity (W)
Backup time
(25°C, Initial Value)
Backup time table Time unit: (Minutes)
BA75T
Connection capacity (W)
20
50
100
200
300
400
Backup time (Minutes)
200
109
56
23
14
9
BA100T/BA100R
Connection capacity (W)
20
50
100
200
300
400
600
800
Backup time (Minutes)
200
109
56
23
14
9
6
4
Note: These backup times are for reference only. Times may vary according to battery life and external
environmental conditions (temperature, etc.).
BA75T/BA100T/BA100R
59
4
Summary of Contents for BA100R
Page 23: ...2 Installation and connection 2 1 Installation Incorrect Positions BA75T BA100T BA100R 22...
Page 87: ...8 Note of Chinese 8 Note of Chinese UPS UPS 1 UPS FA OA Windows BA75T BA100T BA100R 86...
Page 88: ...8 Note of Chinese 2 FA OA A VCCI A BA75T BA100T 12 5 BA100R 13 BA75T BA100T BA100R 87 8...
Page 90: ...8 Note of Chinese 5cm AC 25 5 30 4 AC AC AC AC BA75T BA100T BA100R 89 8...
Page 91: ...8 Note of Chinese ON OFF AC INPUT PROTECTION 1mA AC UPS AC UPS BA75T BA100T BA100R 90...
Page 92: ...8 Note of Chinese BA75T BA100T BA100R 91 8...
Page 93: ...8 Note of Chinese AC UPS 25 25 6 40 2 AC AC DC250V BA75T BA100T BA100R 92...
Page 99: ...9 References 9 2 Dimensions Upright stand for BA100R BAP100R BA75T BA100T BA100R 98...
Page 100: ...9 References 9 2 Dimensions Rubber feet BA75T BA100T BA100R 99 9...
Page 101: ...9 References 9 2 Dimensions Using Ear brackets BAP100RS BA75T BA100T BA100R 100...
Page 103: ...9 References 9 4 China RoHS Information 9 4 China RoHS Information BA75T BA100T BA100R 102...