
1 Preparation
1-4 Name of each part
●
Rear view
<BA75T/BA100T>
<BA100R>
A
B
C
D
I
H
F
E
A
B C D
E
F
H G
G
I
A: RS232C port
B: Contact signal port
C: Remote ON/OFF port
D: Input protection
E: AC input terminal block
F: AC output terminal block
G: Input surge protection GND
H: Power supply output receptacles
(Backup is performed during power failure.)
I: Cooling fan (air vent)
A: Cooling fan (air vent)
B: RS232C port
C: Contact signal port
D: Remote ON/OFF port
E: Power supply output receptacles
(Backup is performed during power failure.)
F: Input protection
G: AC input terminal block
H: AC output terminal block
I: Input surge protection GND
BA75T/BA100T/BA100R
19
1
Summary of Contents for BA100R
Page 23: ...2 Installation and connection 2 1 Installation Incorrect Positions BA75T BA100T BA100R 22...
Page 87: ...8 Note of Chinese 8 Note of Chinese UPS UPS 1 UPS FA OA Windows BA75T BA100T BA100R 86...
Page 88: ...8 Note of Chinese 2 FA OA A VCCI A BA75T BA100T 12 5 BA100R 13 BA75T BA100T BA100R 87 8...
Page 90: ...8 Note of Chinese 5cm AC 25 5 30 4 AC AC AC AC BA75T BA100T BA100R 89 8...
Page 91: ...8 Note of Chinese ON OFF AC INPUT PROTECTION 1mA AC UPS AC UPS BA75T BA100T BA100R 90...
Page 92: ...8 Note of Chinese BA75T BA100T BA100R 91 8...
Page 93: ...8 Note of Chinese AC UPS 25 25 6 40 2 AC AC DC250V BA75T BA100T BA100R 92...
Page 99: ...9 References 9 2 Dimensions Upright stand for BA100R BAP100R BA75T BA100T BA100R 98...
Page 100: ...9 References 9 2 Dimensions Rubber feet BA75T BA100T BA100R 99 9...
Page 101: ...9 References 9 2 Dimensions Using Ear brackets BAP100RS BA75T BA100T BA100R 100...
Page 103: ...9 References 9 4 China RoHS Information 9 4 China RoHS Information BA75T BA100T BA100R 102...