PV6088-F4E017
13
2.2. How to carry and install the product
Keep the following cautions in mind when installing the product:
(1) Remove the main unit, cables and accessories from the shipping box.
(2) Check whether all of the items listed in [Packaged Items] are in place.
(3) Remove the packing materials and check whether there is any visible damage to
the contents.
(4) Set up the main unit, the control box, the light source power supply and computer
into a place that satisfies the installation conditions.
Always firmly hold the base when carrying or installing the product.
Otherwise there is a risk of failure.
Base
Always use two or more persons to unpack, install or carry the
device, which weighs about 20 kg. Handling the device alone may
cause injury.
Do not allow any impact to occur to the device when unpacking or
installing it. Damage to optical parts or undesired effects to the
sample adjustment feature of the product may result, causing failure
or incorrectness.
Avoid installing the product in an unstable place or any place with
strong vibrations. There is a risk of the unit overturning or falling, or
injury. Take the usage conditions into consideration when installing
it.
Do not place equipment so that it is difficult to pull out power supply
cord from rear side receptacle of Control Box and Light Source
Power Supply
Summary of Contents for USPM-RUIII Series
Page 42: ...PV6253 F4E016 USPM RU Ver3 21 004 Software Operation Manual...
Page 89: ...10 Help Menu PV6253 F4E016 47 10 Help Menu 10 1 Version menu Displays the version...
Page 92: ...11 About the Calibration Method for Wavelength Direction PV6253 F4E016 50...
Page 113: ...PV9386 F4E005 1 USPM RU RUIII Installation Instructions Ver 3 21...
Page 130: ...PV9386 F4E005 18 4 In the following screen click the Yes button to complete the uninstallation...