40.
Place Outside Roof Panel so it sits flush on 3rd rafter from the outside (doubled up rafter).
Plywood on roof should be flush with end of rafter at bottom, and with seam of doubled up rafters.
From the outside, screw down through bottom row of shingles into rafter with 1 - 2 1/2” screw. Angle
a 2 1/2” screw from outside rafter into roof plywood.
Shingles overhang plywood
on Outside Roof Panel.
41.
Locate Middle Roof Panel (roof plywood flush with outside of shingles), and place on middle
rafters. Align panel as per
Step 40
and screw panel down to rafters with 2 - 2 1/2” screws in the
bottom row of shingles.
42.
Lift up, position and attach 2nd Outside Roof Panel on Rafters as per
Step 40
.
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 19
Roof Plywood flush
with rafter end.
2 1/2” Screw in
Bottom Row of
Shingles
Angle Screw from Rafter
into Plywood with 2 1/2”
screw as seen in
Step 42
.