55.
Attach
Front
and
Rear Facia
(3/4” x 3 1/2” x 57 1/4”) to roof rafter ends.
There are 2 facia pieces per side. Secure
with 8 - 1 1/2” finishing nails per piece.
Side
Facia
Front Facia will
overlap Side Facia.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 24
56.
Place 1st
Roof Ridge Cap
on roof peak overhanging shingles by approximately 1”. Attach with
2 - 1 1/2” Shingle Nails 9” from end. Place 2nd Ridge Cap 1” back from 1st cap. Attach with
2 - 1 1/2” Shingle Nails 9” from end.
57.
Place 3rd Ridge Cap 8” back from 2nd (enough to cover
shingle nails). Attach 3rd Ridge Cap as per
Step 56
. Continue to
position and attach Ridge Caps until half the roof is complete. From
opposite side, position and attach Ridge Caps as described above.
Score/cut 1 Ridge Cap to 12” or to fit in the center of roof. Attach
center cap with 4 - 1 1/2” Shingle Nails.
8”
Important:
Butt (thick) end
of Ridge Cap will be facing
towards the outside of shed.
Front
Facia
9”
from
end
8”