![background image](http://html.mh-extra.com/html/olt/9x6-cabana-bevel/9x6-cabana-bevel_assembly-manual_732293017.webp)
35.
With both Ridge Boards
connected, completely secure
Gable framing to walls and rafters.
Use 4 - 2” screws per Rafter. Use
an additional 6 - 2” screws to
secure Gable to wall.
Note: you
may have to remove the 2
temporary screws in Gable from
Step 24 and reposition Gable for
best fit prior to completing gable
attachment.
33.
Place front completed Rafter Section
on gable walls as per
Steps 31 & 32.
Gable Notch
Ridge
Board
Offsetting Metal
Ridge Board
Connectors
34.
At the peak, align Ridge Boards so
they are flush together and secure them with
12 - 1 1/4” screws.
Important:
if there is a
gap between Ridge Boards, have a helper
push the front and rear walls
closer together from outside. Walls should
be 70” apart at top from inside of wall plate to
opposite wall plate. To completely secure
Ridge Boards, place 4 - 1 1/4” screws into
any of the remaining Metal Ridge Board
Connector holes. Complete both sides.
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17