2PV/2PW-2
1-5-77
(Align the FFC wire at the main PWB side.)
65. Remove the left and right holders of the
scanner unit at Step 20, 21
and fully
open the scanner unit.
Figure 1-5-124
66. Align the FFC wire like the figure to the
right.
(Seven alignment ribs and one ferrite
core)
Figure 1-5-125
67. Insert the end of the FFC wire into the
connector YC8 on the main PWB.
68. Refit all the parts and the unit detached
in the reverse manner of the above pro-
cedures.
Figure 1-5-126
FFC wire
Wire holder
Alignment ribs
are circled in
red.
Ferrite core
(Wire holder viewed from the machine right side)
YC8
FFC wire
Service Manual
Y116650-5
Summary of Contents for d-Color MF2613En
Page 1: ...SERVICE MANUAL Multifuction Digital Copier d Color MF2613En d Color MF2614En Code Y116650 5...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 38: ...2PV 2PW 1 2 14 This page is intentionally left blank Service Manual Y116650 5...
Page 136: ...2PV 2PW 1 3 98 This page is intentionally left blank Service Manual Y116650 5...
Page 190: ...2PV 2PW 1 4 54 This page is intentionally left blank Service Manual Y116650 5...
Page 241: ...2PV 2PW 1 5 51 9 Remove the scanner unit Figure 1 5 78 Scanner unit Service Manual Y116650 5...
Page 284: ...2PV 2PW 1 5 94 This page is intentionally left blank Service Manual Y116650 5...
Page 288: ...Service Manual Y116650 5 This page is intentionally left blank...
Page 328: ...2PV 2PW 2 2 10 This page is intentionally left blank Service Manual Y116650 5...
Page 354: ...2PV 2PW 2 3 26 This page is intentionally left blank Service Manual Y116650 5...
Page 375: ...UPDATINGSTATUS DATE UPDATEDPAGES PAGES CODE 07 2014 1ST EDITION 375 Y116650 5...