
Manchester - England
Version 7.0 01/02/2019
5
2.5. pro-A-sync Simulation Software
Ohm line arrays must be designed using Ohm’s pro-A-sync simulation software.
For optimal alignment, deployment and safety we recommend all users attend one
of Ohm’s regularly hosted line array training seminars. Details of Ohm’s training
seminars can be found on the Ohm website at www.ohm.co.uk
pro-A-sync software is available as a standalone software package for both
macOS and Windows based operating systems. Download from: www.ohm.co.uk/
downloads/
2.4. Operation
CORA array should always be assembled using 2 people, one on either side of
the array.
During assembly pay attention to the risk of crushing hands and
fi
ngers in
between cabinets.
Ensure all array pins are seated correctly when building the array.
When arrays are being hoisted under no circumstances stand underneath the
array or in the vicinity of the load.
Do not climb on the array.
Wear suitable PPE.