
FRONT LINKS
GROUNDST
AC
K
SPL
AY
LIN
K
GROUNDS
TACK
FRONT LINK
ST
ORAGE
LO
CK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF
CORA
ARRA
Y FRAME -
W
eig
ht 27
kg
Engineered and
m
an
ufactured
in the UK
ST
ORA
GE
FRONT LINKS
GROUND
ST
ACK
SPL
AY
LIN
K
GROUNDST
ACK
FRONT LINK
ST
ORAG
E
LO
CK
6°
4°
2°
0°
- 2
°
- 4
°
- 6
°
C-AF COR
A
ARRA
Y FR
AME -
We
ight 2
7 kg
En
gineered and
manufactured in th
e UK
ST
ORAGE
Manchester - England
Version 7.0 01/02/2019
20
4.6. Flying a Mixed CORA Array
If CORA-S are to be
fl
own in a mixed array these must always be positioned at the top
of the array column.
For a mixed setup two
fl
ying frames are required, one frame is used for the
suspension, the second frame is used beneath the subs to attach CORA/CORA-A
array cabinets. Prepare all the cabinets rigging hardware (as described in chapter
3.7. CORA Array Rigging Mechanism). An additional set of four steel sub links will be
required to attach the second frame beneath the lowest sub in the array.
to add CORA/CORA-A array follow
instructions from pages (16/17)
With the array in the air place
the sub link into the CORA-S
rigging frame.
Prepare the four sub links by removing
the top pin.
Replace the pins from the top of the
sub links Through the CORA-S frame
and the sub links securing them in
place.
If not already done so remove
the bottom pins from the sub
link
Replace the pins through the
frame and the CORA-S array sub
links.
Position the array on the frame
ensuring the holes are lined up.
9
12
13
10
11