
REAR LINKS
GROUNDST
ACK
SPLAY
LIN
K
GROUNDST
ACK
FRONT LINK
ST
ORAG
E
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA
ARRA
Y FRAME -
We
ight 27 kg
Engineered and manufactured in the UK
ST
ORAG
E
Manchester - England
Version 7.0 01/02/2019
10
3.5. Dual Pickpoint Operation
With ‘dual pickpoint’ operation, the vertical alignment of the array is determined by
trimming the hoist motors after the array has been fully assembled and lifted to it’s
operating trim height.
Pickpoint hole 1 and 13 are used in dual pickpoint operation and the angle of the
array calculated using Ohm pro-A-sync. For optimum array vertical alignment an
inclinometer should be attached to the frame and the measuring device operated
from
fl
oor level.
Two shackles (one tonne) must be used in conjunction with wire slings (0.5m) to
ensure that the chain bags of the hoists being used do not foul on the array frame.
Additional weight on the array frame can adjust the array’s angle and overall weight
so careful deployment is essential.
C-AF showing dual pick points
using pickpoints 1 & 13.
Wire sling (0.5m)
Shackle (1 tonne)
Shackle (1 tonne)
Master link connected
to hoist
Pickpoint
(determined
by pro-A-sync
software)
1
2
3
4
5
6
7
8
9
10
11
12
13