
Manchester - England
Version 7.0 01/02/2019
13
4.2. CORA Array Rigging Mechanism
CORA/CORA-A Array
The front top links are located within the cabinet side cheeks. By factory default the
front links are in the storage position. Once the pins are removed the links can be
pushed upwards and the pins replaced in the top holes allowing a cabinet above to
be attached.
The pin holes on the bottom of the cabinet at the front are for connecting front links
from cabinets below.
The splay links on the rear of the cabinet at the top by default are in the storage
position. Removal of the pins here allows the splay links to rotate upwards to be
connected to the correct alignment hole in the cabinet above according to Ohm’s pro-
A-sync software.
On the bottom of the cabinet in the rear the pin holes are for connecting the splay
links from the cabinet below.
Front top link
Rear splay link
Pin A
Remove pin A
from the front top
link. Slide the link
upwards and replace
the pin.
Remove pin B from the rear
splay link, This allows the
rear splay link to rotate out
ready to be located in either
the frame or the cabinet.
Pin B
Pin C
Further instructions of this
procedure are on page (16)
Factory default link positions